INDIAN ARMED FORCES CHIEFS ON OUR RELENTLESS AND FOCUSED PUBLISHING EFFORTS

The insightful articles, inspiring narrations and analytical perspectives presented by the Editorial Team, establish an alluring connect with the reader. My compliments and best wishes to SP Guide Publications.

— General Upendra Dwivedi, Indian Army Chief

"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"

— Admiral Dinesh Kumar Tripathi, Indian Navy Chief

Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.

— Air Chief Marshal A.P. Singh, Indian Air Force Chief
       

Sikorsky's RAIDER X Team Begins Installation Process of US Army's Improved Turbine Engine

West Palm Beach, Fla. October 24, 2023 Photo(s): By Sikorsky
The US Army's Improved Turbine Engine arrived at the Sikorsky facility in West Palm Beach on October 20, 2023. Sikorsky's technical teams and engineers immediately began integrating the engine into the RAIDER X®.

Sikorsky, a Lockheed Martin company is beginning the installation process of the US Army's new Improved Turbine Engine (ITEP) on its RAIDER X aircraft designed for the Future Attack Reconnaissance (FARA) program. The US Army and Sikorsky engineers reviewed the engine after its arrival at the company's West Palm Beach facility and then transferred it to the engine integration test lab next to the RAIDER X assembly area on October 20, 2023.

"Lockheed Martin's model-based systems engineering approach gives the Sikorsky team confidence in this final phase of the RAIDER X build which brings us one step closer to completing this weapon system that will match the rapid pace of the reconnaissance mission," said Future Vertical Lift Vice President Andy Adams. "The data RAIDER X gathers – and the speed and agility with which it operates – will support the Army's mission for deep sensing capability and unsurpassed networking, connecting Soldiers and the joint force to the information they need to complete their missions."

View our latest video.

RAIDER X is currently 98% complete. After installing additional instrumentation, Sikorsky will begin engine installation immediately. Following that, final system tests and check-outs will be accomplished. Those will be followed by engine turn on and drive system check out with the ITEP in the aircraft. After successful system checks, we will conduct flight acceptance testing and proceed to first flight.

First flight of RAIDER X is expected in late 2024, when the engine and aircraft are approved for flight by the Army.

In addition to RAIDER X, the Army intends to transition the ITEP engine to the UH-60 Black Hawk fleet.

"With increased fuel efficiency and 50% more power than the current engine, the ITEP engine is one of the cornerstones to Black Hawk modernization and will increase the aircraft's lift capability and range," Adams said. "As the US Army fields Future Vertical Lift aircraft, the Black Hawk will remain the foundational tactical air assault and utility aircraft for the US Army."