The insightful articles, inspiring narrations and analytical perspectives presented by the Editorial Team, establish an alluring connect with the reader. My compliments and best wishes to SP Guide Publications.
"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"
Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.
The FICV were earlier planned to be inducted into the Army in year 2025 but looking at the current state of affairs, induction may be prolonged easily by few more years. How are we ensuring a level playing field and encouraging the private sector who has invested heavily in the FICV project these past years without financial support from government, but is being kept in limbo?
The Infantry Combat Vehicle (ICV) is a potent and formidable weapon platform vital for Mechanised Infantry. Our vast frontiers and rogue neighbours like China and Pakistan heightens the need for ICVs providing the infantry with: collective troop cross-country mobility over land and water; firepower, and; protection from enemy fire. India’s Futuristic Infantry Combat Vehicle (FICV) project is classic example of how to stonewall military modernisation by delaying projects through bureaucratic machinations, political considerations and unaccountability, which is apparent from below:
The EoI issued in 2009 laid down the FICV to be: operable by three-man crew; carry seven additional soldiers with combat loads; provide protection against 14.5mm calibre weapons; amphibious; air-transportable; 18-20 tonne maximum weight; fire power to include grenade launcher, co-axial machine gun, capable of firing anti-tank missiles (fire and forget type), and; minimum 50 per cent indigenous content.
News reports of March 18, 2020 now reveal that the OFB and DRDO are to conjointly develop FICV, named ‘Mark-I’. According to Hari Mohan Chairman OFB, ‘Mark-I’ will be ready in 3-5 years whereas its sequel Mark II can take up to a decade in its development.
After over 30 years since the perceived need and 12 years in the works, with on-and-off rumours of the FICV project being shelved-progressed-shelved, these vacillations have seriously undermined the capability of the Army
On June 2, 2020, MoD placed an order on the OFB to upgrade Russian-origin BMP-2/2k ICV ‘Sarath’ for the Army at the cost of 1,094 crore ($145 million). This upgrade is to be carried out at Ordnance Factory, Medak. BMP-II Sarath was observed during rehearsals for DefExpo 2020. Whether ‘Sarath’ is planned as substitute for FICV is not known. Hopefully this is not the case but if it is, then the MoD has circumvented earlier objections by private industry that OFB should not be allowed to team up with DRDO since DRDO is finally responsible for technology evaluation and approval.
Meanwhile, fate of the FICV project remains unknown. But it would not be surprising if MoD restarts the process afresh with a third EoI, implying setback of few more years. The FICV were earlier planned to be inducted into the Army in year 2025 but looking at the state of affairs induction may be prolonged easily by few more decades.
BMP-II has no night fighting capability. It was hoped that the FICV will at least commence replacing the BMP-II by 2017, with phasing out of BMP-II commencing 2018. In 2017, MoD awarded 2,400 crore contract to upgrade 693 BMP-2s with night fighting capabilities but whether upgrading of all BMP-II has been completed is not known.
There is lot of talk about level playing field being ensured for the private sector, which is labeled pure rhetoric by the private players. How are we encouraging the private sector who has invested heavily in the FICV project past years without financial support from government but is being kept in limbo? This also indicates that the claim to corporatise the OFB is unlikely to go beyond cosmetics.
Satellite images of July 2020 showing Chinese T-15 / ZTPQ light tanks in Eastern Ladakh was wakeup call for India having rushed T-72 / T-90 tanks to halt China’s aggression in Eastern Ladakh; these being heavier and more suited for plains and deserts. India reportedly is now scouting for light tanks but how many years or decades before Army will get them? Last year Army invited proposals from domestic and foreign firms for designing a future ready combat vehicle (FRCV) ostensibly to replace the T-72 tanks. But looking at the FICV project, FRC V could take another 25-35 years?
Lack of strategic sense and jingoism has become the bane of India, which was reflected even in the Chief of Defence Staff (CDS) talking of marching into Pakistan Occupied Kashmir (POK) whenever government wants but also saying maintaining just 10 days ammunition reserves is sufficient. Finally, if the present Chinese aggression too does not wake us up into modernising our military speedily in holistic fashion, we probably will continue to remain in the same state.